Half Year Accounts
Released
Released
Announcement PDF
FBR Limited
Appendix 4D
Half year report
1.
Company details
FBR Limited
ABN
Current period
Prior period
58 090 000 276
31 Dec 2023
31 Dec 2022
2.
Results for announcement to the market
% Change
$
2.1 Revenues from ordinary activities
Up 5%
683,113
2.2 Loss from ordinary activities after tax
attributable to members
Up 51%
19,782,321
2.3 Loss for period attributable to members
Up 51%
19,782,321
2.4 & 2.5 No dividends were proposed or paid in the current or prior period
2.6
Explanations of any of the figures in 2.1 to 2.4 above necessary to enable the figure to
be understood.
Revenue for the period was $683,113 (2023: $653,475) including Wall as a Service, Construction
Services and Residential housing sales.
The loss for the period was $19,782,321 (2023: $13,064,117) including professional services ,
corporate administration, director and employee remuneration of $11,156,880, Development
costs of $929,446 and non-cash share-based payments, depreciation, amortisation and
impairment of $9,737,872.
3.
Net tangible assets per security
Dec 2023: $0.01
Dec 2022: $0.01
Net Tangible Assets excludes right-of-use assets with a carrying value of $1,950,919 as at 31
December 2023.
4.1 Control over gained entities
Name of entity
Fastbrick Americas Engineering LLC
The date of the gain of control
27 December 2023
Where material, the contribution
of such entities to the reporting
entity’s profit from ordinary
activities during the period and
the profit or loss of such entities
n/a
during the whole of the previous
corresponding period
Where material, the profit or loss
of such entities during the whole
of the previous corresponding
period
n/a
4.2 Control loss over entities
Name of entity
n/a
The date of the loss of control
n/a
Where material, the contribution of such
entities to the reporting entity’s profit from
ordinary activities during the period and the
profit or loss of such entities during the whole
of the previous corresponding period
n/a
Where material, the profit or loss of such
entities during the whole of the previous
corresponding period
n/a
5. Dividends
No dividends were proposed or paid in the current period or prior period. No dividend
reinvestment plans were in effect in the current or prior period.
6.
Associates and joint ventures
The group has not entered any new joint venture arrangements.
7.
Foreign entities
Foreign entities have been accounted for in accordance with Australian Accounting Standards .
8.
Audit qualification
Do the accounts contain an independent audit report or review that is subject to a modified
opinion, or emphasis of matter or other matter paragraph?
Yes/ No
Material uncertainty related to going concern
We draw attention to Note 3 in the financial statements, which indicates that the Group incurred
a net loss of $19,782,321 during the half year ended 31 December 2023, and for that period, the
Group’s cash outflows from operating and investing activities were $17,104,351. As stated in
Note 3, these events or conditions, along with other matters as set forth in Note 3, indicate that
a material uncertainty exists that may cast doubt on the Group’s ability to continue as a going
concern. Our opinion is not modified in respect of this matter.
FBR Limited
Interim financial statements
For the half-year ended
31 December 2023
Directors’ Report
The Directors of FBR Limited (“the Company”) present their report together with the financial
statements of the Consolidated Entity, being FBR (‘the Company’) and its controlled entities (‘the
Group’) for the half-year ended 31 December 2023.
Director details
The following persons were Directors of the Company during or since the end of the financial half year:
Mr Michael Pivac (Chief Executive Officer and Managing Director)
Mr Mark Pivac (Chief Technical Officer and Executive Director)
Mr Richard Grellman AM (Chairman)
Mr Grant Anderson (Non-Executive Director)
Mr Greg Smith (Non-Executive Director)
Ms Nancy Milne (Non-Executive Director)
Review of operations and financial results
In the FY24 half year, the Group generated $683,000 revenue, up approximately $30,000 on the
previous period, derived largely from the proceeds of residential housing sales.
In September 2023, FBR advised that its flagship next-generation Hadrian X® had successfully
built its first structure outdoors with large U.S. format concrete masonry blocks at an average lay
rate of over 240 blocks per hour across the entire structure. During the build, a new peak sustained
outdoor lay speed record was achieved, reaching 326 blocks per hour, surpassing the previous
peak set during indoor testing, with further improvements in lay speed expected to be achieved
as outdoor testing work continues.
The Company announced that, due to significant demand for its technology, it had made the
strategic decision to re-prioritise the delivery of United States-spec Hadrian X® construction
robots to the U.S. as soon as possible. The Company’s second next-generation Hadrian X®
currently in production, originally intended to be fitted to an Australian certified truck chassis, will
now instead be fitted to a U.S. certified truck chassis as soon as the first of three on order is
delivered, allowing it to begin commercial operation in the U.S. as soon as possible thereafter,
where it will be positioned into FBR’s United States Wall as a Service ® operating entity in Florida.
The Company’s first next-generation Hadrian X® will be deployed to the U.S. for demonstration
work as soon as its testing and optimisation is complete. A third next-generation Hadrian X® has
commenced production, and procurement for a fourth, fifth and sixth next-generation Hadrian X®
is underway.
Over the course of the half, construction activities at the Willagee project re-commenced following
the completion of requisite site work, such as the pouring of second storey concrete slabs, which
1
enabled FBR’s construction team to mobilise to site and continue construction of the walls at the
northern end of the development.
Mid-way through the period, site works at the St. James development were completed, including
the pouring of the first two slabs, enabling construction of the first four stages of the build. The
project comprises eight, two-storey townhouses, located in the Perth suburb of St. James.
On 9 October 2023, the Company announced the successful completion of an oversubscribed
Institutional Placement to raise A$6.2 million through the issuance of 248 million shares at an issue
price of A$0.025 per share. The equity raising provided general working capital for the Company,
enabling it to progress the commercialisation strategy for a Wall as a Service (WaaS) partnership
in the United States, and to continue procurement and manufacture of additional next generation
Hadrian X® robots. The Placement Price of A$0.025 represented an 11% discount to the 15-day
VWAP of A$0.028 per share. Allotment of the new shares occurred on Monday, 16 October 2023
with trading commencing on the same date.
During the period, FBR advised that the period of exclusivity granted to GP Vivienda under a nonbinding Term Sheet in November 2021 for the negotiation of an agreement relating to the delivery
of Wall as a Service® in Mexico had concluded. FBR’s strategic focus on the high-margin market of
the United States and associated preparations for its first international deployment there took
precedence over some milestones under the Term Sheet with GP Vivienda, namely the completion
of a pilot building program of 20 homes in Mexico with the Hadrian X® which has not been
completed within the originally planned timeframe. FBR now anticipates the first walls built by
Hadian X® in an international market will be in Florida in the 2024 calendar year, as previously
indicated to the market. The non-binding Term Sheet between FBR and GP Vivienda remains in
place except that the binding exclusive dealing obligations have expired, which means that FBR is
free to negotiate and enter into binding agreements for the provision of Wall as a Service® in
Mexico with other entities if it wishes to. Similarly, GP Vivienda is free to enter into arrangements
with any other robotic bricklaying providers in Mexico.
FBR and GP Vivienda maintain a working relationship, having completed a number of the other
milestones under the term sheet together, and will consider on an ongoing basis , the commercial
benefit of establishing a Wall as a Service® operating entity in Mexico after FBR has commenced
operations in Florida.
On 2 November 2023, the Company advised that it had filed nine new International PCT patent
applications covering a range of technologies involved in the next-generation Hadrian X®, bringing
the total number of patent families covering the Hadrian X ®, DST ®, the Fastbrick Wall System ® and
adjacent outdoor robotics applications utilising FBR’s core technology to over 40. The filing of
these applications further strengthened FBR’s leading position within the construction robotics
space and is in line with the Company’s strategy of securing the commercial opportunity for
dynamically stabilised placement of product in outdoor, uncontrolled environments through long term patent protection.
The filings capture a number of FBR’s research and development efforts relating to the next generation Hadrian X® , including the protection of the new modular design and distributed control
architecture, and the shuttle-based block delivery system that transports blocks from the base of
the machine to the laying head, enabling faster block delivery, eliminating block handovers
between different modules and opening up avenues to lay or place other materials such as roof
tiles. The next-generation Hadrian X® is far more advanced than its predecessor, with improved
lay speed, boom reach, reliability, and versatility. The first next-generation Hadrian X® is planned
to be shipped to the United States to commence a Demonstration Program with CRH Ventures.
2
The loss for the period was $19,782,321 (2022: $13,064,117) including an R&D tax rebate of
$1,883,840, professional services, corporate administration, director and employee remuneration
of $11,156,881, Development costs of $929,446 and non-cash share-based payments,
depreciation, amortisation and impairment of $9,737,872.
Subsequent to the end of the period, on 18 January 2024, the Company advised that it had
executed a binding suite of option agreements with CRH Ventures Americas, Inc. (‘CRH Ventures”),
a subsidiary of CRH plc (‘CRH’), one of the largest concrete block suppliers in the United States.
Affiliates of CRH Ventures and FBR executed a Demonstration Program agreement to jointly
construct up to 10 houses in the United States with FBR’s Hadrian X ® construction robot, while
FBR has granted CRH Ventures an exclusive Option to enter into an exclusive joint venture for the
supply of Wall as a Service® in the United States following the successful achievement of the
milestones of the Demonstration Program.
Under the agreement, FBR will provide one Hadrian X ® built to Australian specifications to
complete the demonstration builds. Under the Option agreement, CRH Ventures has purchased an
Option for further collaboration with FBR pending the success of the Demonstration Program
aimed at constructing up to 10 houses in Florida. Upon execution of the Demonstration Program
and Option Agreements, 10% of the US$2.0 million Option fee was paid; 40% was subsequently
paid upon completion of a Factory Acceptance Test on Tuesday, 20 February 2024; 30% will be
payable upon completion of a Site Acceptance Test in the United States; and the remaining 20%
will be payable immediately upon the completion of the Demonstration Program. Milestone
payments are non-refundable.
Once the Option is exercised, the joint venture will immediately place an order for a further 20
Hadrian X® construction robots, to be funded through a US$40 million loan facility provided to the
joint venture by CRH Americas.
The Hadrian X® unit passed its Factory Acceptance Test by completing a test build at FBR’s
premises in Perth at an effective lay rate of 330 blocks per hour, more than the required 285
blocks per hour, using only a tablet to control the Hadrian X ® and a crew of no more than three
people. The Hadrian X® unit will pass its Site Acceptance Test upon the completion of a test build
outdoors with the same requirements as the Factory Acceptance Test at an agreed location in
Florida, and confirmation from an independent structural engineer that the constructed walls of
the test build are consistent with the design and meet applicable building standards.
Upon the successful completion of the Site Acceptance Test, an affiliate of CRH Ventures, and
Fastbrick Americas Engineering LLC (‘Fastbrick Americas Engineering’), a subsidiary of FBR, will
conduct a Demonstration Program in Florida consisting of the cons truction of the external walls
of between five and ten single storey houses using concrete blocks supplied by an affiliate of CRH
Ventures. Fastbrick Americas Engineering is responsible for entering into contracts for five of the
houses in the Demonstration Program, while an affiliate of CRH Ventures is responsible for
entering into contracts for up to five houses in the Demonstration Program, subject to timing
requirements. The Demonstration Program will be deemed complete when FBR completes
construction of its five houses and any houses contracted by an affiliate of CRH Ventures.
On 22 January 2024, the Company announced that it had completed an institutional Placement to
raise approximately A$12.6 million, comprising the issue of approximately 466.4 million shares at
an issue price of A$0.027 per share.
The Placement Price of A$0.027 is equal to the last closing price per share on 17th January 2024
before the Company entered a trading halt to conduct the capital raise. New Shares issued under
3
the Placement will be issued utilising FBR’s existing capacity under Listing Rule 7.1 and will rank
pari passu with existing ordinary shares from the date of issue. Allotment of the New Shares under
the Placement is expected to occur on Monday, 29 January 2024 with trading of the New Shares
commencing on the ASX on the same date.
The Placement received strong interest and support from Australian and international investors
including FBR’s largest shareholders such as Brickworks Limited , M&G and FIL.
Auditor’s independence declaration
A copy of the Auditor’s Independence Declaration as required under s307C of the Corporations Act
2001 is included on the following page of this financial report and forms part of this Directors ’
Report.
Signed in accordance with a resolution of the Directors:
Michael Pivac
Chief Executive Officer and Managing Director
27th February 2024
4
Grant Thornton Audit Pty Ltd
Level 43 Central Park
152-158 St Georges Terrace
Perth WA 6000
PO Box 7757
Cloisters Square
Perth WA 6850
T +61 8 9480 2000
Auditor’s Independence Declaration
To the Directors of FBR Limited
In accordance with the requirements of section 307C of the Corporations Act 2001, as lead auditor for the review
of FBR Limited for the half-year ended 31 December 2023, I declare that, to the best of my knowledge and belief,
there have been:
a
no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation to
the review; and
b
no contraventions of any applicable code of professional conduct in relation to the review.
GRANT THORNTON AUDIT PTY LTD
Chartered Accountants
L A Stella
Partner – Audit & Assurance
Perth, 27 February 2024
www.grantthornton.com.au
ACN-130 913 594
Grant Thornton Audit Pty Ltd ACN 130 913 594 a subsidiary or related entity of Grant Thornton Australia Limited ABN 41 127 556 389 ACN 127 556 389.
‘Grant Thornton’ refers to the brand under which the Grant Thornton member firms provide assurance, tax and advisory services to their clients and/or
refers to one or more member firms, as the context requires. Grant Thornton Australia Limited is a member firm of Grant Thornton International Ltd (GTIL).
GTIL and the member firms are not a worldwide partnership. GTIL and each member firm is a separate legal entity. Services are delivered by the member
firms. GTIL does not provide services to clients. GTIL and its member firms are not agents of, and do not obligate one another and are not liable for one
another’s acts or omissions. In the Australian context only, the use of the term ‘Grant Thornton’ may refer to Grant Thornton Australia Limited ABN 41 127
556 389 ACN 127 556 389 and its Australian subsidiaries and related entities. Liability limited by a scheme approved under Professional Standards
Legislation.
w
#11314215v1
Consolidated Statement of Profit or Loss and
Other Comprehensive Income
For the half-year ended 31 December 2023
Notes
31 December
2023
$
31 December
2022
$
Continuing operations
Revenue
Cost of sales
6
683,113
(639,901)
653,475
(1,142,839)
43,212
(489,364)
Interest income
R&D tax incentive
112,419
1,883,840
109,371
2,945,805
Other income
Professional services
2,407
(1,797,469)
15,045
(513,689)
Directors’ and employees’ benefits
(6,332,895)
(6,609,955)
Other expenses
(3,026,517)
(2,424,488)
Development costs
Share-based payments
Depreciation
10, 11
(929,446)
(2,280,396)
(1,026,468)
(895,939)
(2,523,039)
(892,272)
Amortisation of development costs
Impairment expense
13
10
(1,663,560)
(4,833,777)
(1,565,198)
-
Inventory reversal/(impairment)
9
66,329
(220,394)
(19,782,321)
(13,064,117)
Income tax expense
-
-
Loss for the period
(19,782,321)
(13,064,117)
-
-
(19,782,321)
(13,064,117)
Gross profit/(loss)
Loss before tax
Other comprehensive income for the period, net of tax
Total comprehensive income for the period
Total comprehensive loss for the period
Basic loss per share in cents per share
15
(0.52)
(0.44)
Diluted loss per share in cents per share
15
(0.52)
(0.44)
The accompanying notes form part of these financial statements.
6
Consolidated Statement of Financial Position
As at 31 December 2023
Notes
31 December
2023
$
30 June
2023
$
Assets
Current
Cash and cash equivalents
Trade and other receivables
7
8
5,243,391
11,478,092
12,397,405
9,566,644
Inventories
Other current assets
9
813,339
1,414,932
1,154,236
1,592,509
18,949,754
24,710,794
Current assets
Non-current
Property, plant and equipment
10
16,098,165
15,092,258
Right-of-use assets
Development costs
11
13
1,950,919
43,674,320
2,248,201
44,544,728
Non-current assets
61,723,404
61,885,187
Total assets
80,673,158
86,595,981
4,959,126
2,953,631
Liabilities
Current
Trade and other payables
Provisions
Lease liabilities
12
2,284,774
1,343,289
2,539,926
1,397,658
Borrowings
14
9,872,056
5,227,093
18,459,245
12,118,308
375,187
278,833
Current liabilities
Non-current
Provisions
Lease liabilities
12
613,487
869,942
Borrowings
14
1,467,970
1,820,302
Non-current liabilities
2,456,644
2,969,077
Total liabilities
20,915,889
15,087,385
Net assets
59,757,269
71,508,596
156,794,382
5,309,435
148,845,254
5,802,820
Accumulated losses
(102,346,548)
(83,139,478)
Total equity
59,757,269
71,508,596
Equity
Equity attributable to owners of the parent:
Share capital
Reserves
16
18
The accompanying notes form part of these financial statements.
7
Consolidated Statement of Changes in Equity
For the half-year ended 31 December 2023
Share
capital
Performanc
e
right
reserve
Share
option
reserve
Accumulated
losses
Total
equity
$
$
$
$
$
148,845,254
3,536,801
2,266,019
(83,139,478)
71,508,596
Loss for the period
-
-
-
(19,782,321)
(19,782,321)
Other comprehensive income
-
-
-
-
-
Total comprehensive loss for the period
-
-
-
(19,782,321)
(19,782,321)
Shares issued - Capital raising (refer to Note
16)
6,200,000
-
-
-
6,200,000
Capital raising costs (refer to Note 16)
(449,402)
-
-
-
(449,402)
Performance rights converted to shares
(refer to Note 16)
2,198,530
(2,198,530)
-
-
-
Performance rights forfeited (refer to Note
18)
-
(48,625)
-
48,625
-
Performance rights expired (refer to Note 18)
-
(526,626)
526,626
-
Performance rights issued to employees and
directors (refer to Note 18)
-
893,429
-
-
893,429
Options and loan funded shares issued to
employees and directors (refer to Note 18)
-
-
1,386,967
-
1,386,967
156,794,382
1,656,449
3,652,986
(102,346,548)
59,757,269
Balance at 1 July 2023
Transactions with owners:
Balance at 31 December 2023
8
Consolidated Statement of Changes in Equity
For the half-year ended 31 December 2022
Share
capital
Performanc
e
right
reserve
Share
option
reserve
Accumulated
losses
Total
equity
$
$
$
$
$
Balance at 1 July 2022
116,567,987
1,998,671
1,497,925
(61,799,181)
58,265,402
Prior period adjustments
-
-
-
-
-
Loss for the period
-
-
-
(13,064,117)
(13,064,117)
Other comprehensive income
-
-
-
-
-
Total comprehensive loss for the period
-
-
-
(13,064,117)
(13,064,117)
Shares issued - Capital raising (refer to Note
16)
23,189,628
-
-
-
23,189,628
Capital raising costs (refer to Note 16)
(1,349,177)
-
-
-
(1,349,177)
Performance rights converted to shares
(refer to Note 16)
998,135
(998,135)
-
-
-
Performance rights forfeited (refer to Note
18)
-
(35,071)
-
35,071
-
Performance rights expired (refer to Note 18)
-
(103,815)
103,815
-
Performance rights issued to employees and
directors (refer to Note 18)
-
1,011,773
-
-
1,011,773
Options & loan funded shares issued to
employees and directors (refer to Note 18)
-
-
1,511,266
-
1,511,266
Options and loan funded shares expired
(refer to Note 18)
-
-
(1,150,000)
1,150,000
-
-
-
(356,720)
356,720
139,406,573
1,873,423
1,502,471
(73,217,692)
Transactions with owners:
Options and loan funded shares extended
during the period (refer to Note 18)
Balance at 31 December 2022
9
69,564,775
Consolidated Statement of Cash Flows
For the half-year ended 31 December 2023
31 December
2023
31 December
2022
$
$
94,656
640,958
19,781
724,269
(11,024,809)
(582,412)
(11,195,752)
(369,130)
73,200
73,200
(10,798,407)
(10,747,632)
Purchase of property, plant and equipment
Development costs
Proceeds from the settlement of other financial asset
(5,460,246)
(959,008)
113,310
(4,875,149)
(992,004)
-
Net cash used in investing activities
(6,305,944)
(5,867,153)
Financing activities
Proceeds from issue of share capital
6,200,000
23,189,628
Capital raising costs
Proceeds from borrowings
(449,402)
5,001,715
(1,366,905)
292,752
Repayment of borrowings
Transaction costs related to loans and borrowings
(671,034)
(130,942)
(578,434)
(90,740)
Net cash from financing activities
9,950,337
21,446,301
Net (decrease)/increase in cash and cash
equivalents
(7,154,014)
4,831,516
Cash and cash equivalents, beginning of period
12,397,405
10,686,594
-
-
5,243,391
15,518,110
Operating activities
Interest received
Receipts from customers
Payments to suppliers and employees
Interest paid
Government grants
Net cash used in operating activities
Investing activities
Exchange differences on cash and cash equivalents
Cash and cash equivalents, end of period
The accompanying notes form part of these financial statements.
10
Notes to the Condensed Interim Consolidated Financial
Statements
1
Nature of operations
FBR Limited (“the Company”) and its controlled subsidiaries (“the Group”) is developing technology
to build an automated robotic bricklaying machine capable of completing brickwork at potentially
significantly lower cost and higher quality than traditional methods. FBR has secured patents to
protect its intellectual property rights in its technology in key markets.
2
General information and basis of preparation
The interim consolidated financial statements (‘the interim financial statements’) of the Group
are for the six (6) months ended 31 December 2023 and are presented in Australian Dollars
($AUD), which is the functional currency of the Parent Company.
These general purpose interim financial statements have been prepared in accordance with the
requirements of the Corporations Act 2001 and AASB 134 Interim Financial Reporting. They do
not include all of the information required in annual financial statem ents in accordance with
Australian Accounting Standards, and should be read in conjunction with the financial report for
the year ended 30 June 2023 as well as any public announcements made by the Company
during the half-year in accordance with continuous disclosure requirements arising under the
Australian Securities Exchange Listing Rules and the Corporations Act 2001.
The interim financial statements have been approved and authorised for issue by the Board of
Directors on 27 February 2024.
3
Going Concern
The Consolidated Financial Report has been prepared on a going concern basis, which
contemplates the continuity of normal business activity and the realisation of assets and the
settlement of liabilities in the normal course of business.
The Group incurred a net loss of $19,782,321 during the six months ended 31 December 2023,
and for that period, the Group’s net cash outflows from operating and investing activities
totalled $17,104,351. The ability for the Group to continue as a going concern and to fund its
ongoing Hadrian X® programme is dependent upon the Group successfully raising additional
capital and continuing to be eligible for receipt of government R&D tax incentives. Whilst the
Directors are confident of the Group’s ability to continue as a going concern, due to the factors
mentioned above, there is material uncertainty that may cast doubt on the Group’s ability to
continue as a going concern. If the Group is unable to continue as a going concern, it may be
required to realise its assets and or settle its liabilities other than in the ordinary course of
business and at amounts different from those stated in the financial report.
The Group held cash and cash equivalents at balance date of $5,243,391 and was working capital
positive. The Group has receivables of $11,478,092 at balance date. The Group has prepared a
cash flow forecast for the next 12 months which demonstrates that with further equity raisings,
continued access to the R&D tax incentive program and the existing cash reserves and
receivables, there is the necessary working capital for the Group to continue its ongoing Hadrian
X programme and to provide the necessary working capital to cover its corporate costs over the
next year.
11
4
New standards, interpretations and amendments adopted by the Company
The accounting policies adopted in the preparation of the interim condensed consolidated
financial statements are consistent with those followed in the preparation of the Company's
annual consolidated financial statements for the year ended 31 December 2023, except for the
adoption of new standards effective as of 1 January 2023. The Company has not early adopted
any standard, interpretation or amendment that has been issued but is not yet effective. Several
amendments apply for the first time in 2023, but do not have an impact on the interim
condensed consolidated financial statements of the Company.
5
Estimates
When preparing the interim financial statements, management undertakes a number of
judgements, estimates and assumptions about recognition and measurement of assets,
liabilities, income and expenses. The actual results may differ from the judgements, estimates
and assumptions made by management, and will seldom equal the estimated results.
The judgements, estimates and assumptions applied in the interim financial statements ,
including the key sources of estimation uncertainty were the same as those applied in the last
annual financial statements for the year ended 30 June 2023, other than referred to above.
6
Revenue
Consolidated
31 December
31 December
2023
2022
$
$
Wall as a Service and Construction Services sales
118,749
213,801
Residential housing sales
564,364
439,674
683,113
653,475
7
Cash and cash equivalents
Consolidated
31 December
30 June
2023
$
2023
$
Cash at bank and on deposit
2,475,141
12,397,405
Restricted cash 1
2,768,250
-
5,243,391
12,397,405
1.
12
Restricted cash represents cash deposited into a separate bank account and designated as collateral for a loan facility in the
same amount in accordance with FBR’s contractual obligations .
8
Trade and other receivables
Trade and other receivables consist of the following:
Consolidated
Research and Development tax refund 1
31 December
30 June
2023
2023
$
$
10,806,403
8,768,251
92,155
-
GST receivable
247,646
378,011
Director loans
280,123
257,182
9,555
14,733
Grant receivable
-
73,200
Other receivables
42,210
75,267
11,478,092
9,566,644
Trade debtors
2
Interest receivable
1.
2.
9
R&D tax refund is an accrual based on the receivable of $8,768,251 for the lodged 30 June 2023 tax return and an estimated R&D
tax refund of $2,038,152 for the 6 months ended 31 December 2023.
Includes $190,000 loan to Mark Pivac (plus interest of $90,123) in connection with Performance Rights issued under the Group’ s
Performance Rights Plan. The loan has a maturity date of 30 June 2024 and an interest rate at the higher of 4.52% per annum
and the highest interest rate payable by the Company to any financier of the company at the relevant time.
Inventories
Inventories include the following components:
Consolidated
31 December
30 June
2023
2023
$
$
Cost
747,010
1,353,883
Inventory impairment
66,329
(199,647)
813,339
1,154,236
13
10
Property, plant and equipment
The following tables show the movements in property, plant and equipment:
PLANT &
EQUIPMENT
FURNITURE &
FITTINGS
ICT
EQUIPMENT
HADRIAN
WIP
TOTAL
$
$
$
$
$
Gross carrying amo
Share your feedback
Discover